From StrategyWiki, the video game walkthrough and strategy guide wiki
Jump to navigation Jump to search

For some time now, I've had my eye on an abandoned part of the city that would be ideal for a holiday resort. It's far from the loud and stuffy inner city with a perfect view of the ocean on one side and a magnificent view of the city skyline on the other. Of course, we want to stand out with a perfect location and easy accessibility. This means that the construction of a direct and safe transport link across the water to the vacation resort is crucial. And that's where you come in.

This guide refers to the steps and rewards with the highest job scope. Adjusting the job scope to medium or low will result in fewer steps and reduced rewards.

Rousing Current
Rousing Current

Required Vehicles

  • Rotary drilling rig
  • Tractor + cargo trailer
  • Concrete mixer
  • Concrete pump
  • Mobile crane
  • Asphalt paver
  • Asphalt compactor

Recommended Vehicles

  • Tractor with crane + multitrailer
  • Asphalt dumper

Bridge[edit]

Briefing
  • Speak with the tourism officer
Deep Foundation (159,000)
  • Perform drilling
  • Deliver construction materials
    • Required materials: Bulk Material Transport Sack, Pallet of Concrete Formwork (x2), Pallet of Wood, Rebar Mesh
  • Pour slab foundation
  • Deliver construction materials
    • Required materials: Bulk Material Transport Sack, Pallet of Concrete Formwork (x2), Pallet of Wood, Rebar Mesh
    • Opposite riverbank, use the gas station on the other bank to fast travel if necessary
  • Pour slab foundation
Concrete Bearing Structure (640,000)
  • Pour columns
    • Four columns to pour. Nine segments per column. Tenth segment is completed automatically.
    • A combination concrete mixer/pump will have insufficient reach to complete this objective.
    • Two columns are on the opposite riverbank, use the gas station on the other bank to fast travel if necessary.
Bearing Structure (35,000)
  • Place beams
    • One of the two beams is on the other side of the river.
    • Any crane can lift the beams, but only mobile cranes have sufficient reach to place them on the bridge supports.
  • Place special components
    • Two are on the opposite riverbank.
Crane Work (50,000)
  • Place bridge deck
    • Up to 9 bridge deck segments can be placed on a single side of the riverbank before you must switch to the other river bank.
    • 20 bridge deck segments in total.
    • Barges appear in the river to hold the bridge deck components over the river.
    • Both sides can be built simultaneously.
Roadworks (537,600)
  • Apply asphalt
  • Compact asphalt
Debriefing
  • Speak with the tourism officer

In my mind, I can just see the wealthy vacationers cruise along here in their shiny rides. I'm sure that I'm not the only one who is dreaming about this. We finally created a fast and safe link with the new bridge. Before that, you had to take the long way around the outskirts for many miles. Now that's a thing of the past. And an hourly sightseeing tour across the bridge into the vacation resort is already being planned. It's coming along.