Jump to navigation
Jump to search
Finally, the foundation has been laid to start construction on the new property. I have always envisioned a hotel complex that offers enough room and living space for the wealthier guests as well as the average vacationers. Because we don't want to exclude any target group here. When it's spring break, we'll have an entire city full of young people and rgoup travelers who have to be accommodated somewhere.
This guide refers to the steps and rewards with the highest job scope. Adjusting the job scope to medium or low will result in fewer steps and reduced rewards.
Required Vehicles
- Concrete mixer
- Concrete pump
- Tractor + cargo trailer
Recommended Vehicles
- Tractor + multitrailer
Hotel Complex[edit]
- Briefing
- Speak with the tourism officer
- Basement (222,500)
- Deliver construction materials
- Materials required: Rebar mesh (x2), Cable drum, Pallet of Wood
- Deliver construction materials
- Materials required: Pallet of concrete formwork (x6)
- Can be done concurrently with the above objective.
- Unpack construction materials
- Pour slab foundation
- Unpack construction materials
- Pour walls
- Stairwell (326,300)
- Remove topsoil
- Deliver construction materials
- Materials required: Pallet of concrete bags, Pallet of concrete elements, Pallet of paving stones
- Unpack construction materials
- Deliver construction materials
- Materials required: Rebar mesh (x2), Cable drum, Pallet of wood
- Unpack construction materials
- Pour slab foundation
- Pour slab foundation
- Stairwell (153,800)
- Place components
- Prefabricated wall element concrete (x2)
- Materials are provided.
- Pour walls
- Pour walls
- Can be done concurrently with above objective.
- Place components
- Prefabricated wall element concrete (x4)
- Pour walls
- Pour walls
- Place components
- Prefabricated wall element concrete (x4)
- Pour walls
- Pour walls
- Concrete Bearing Structure (245,300)
- Deliver concrete components
- Materials required: Concrete beam (x3)
- Deliver construction materials
- Materials required: Pallet of wood (x4), Pallet of insulation (x2), Pallet of oriented strand boards (x1)
- Can be done concurrently with above objective.
- Unpack construction materials
- Place construction components
- Concrete beam (x4)
- Materials are provided.
- Unpack construction materials
- Unpack construction materials
- Unpack construction materials
- Unpack construction materials
- Unpack construction materials
- Deliver construction materials
- Materials required: Ceiling component (x4)
- Unpack construction materials
- Place ceiling components
- Concrete the ceiling
- Ground Floor (65,700)
- Upper Floor (125,700)
- Top Floor (57,200)
- Flat Roof Construction (357,500)
- Pool Construction (568,000)
- Debriefing
- Speak with the tourism officer