From StrategyWiki, the video game walkthrough and strategy guide wiki
Jump to navigation Jump to search

Hi. I'm happy to see a new face in the industry. I was hired to establish beach tourism for the city as a secure source of revenue and to draw upscale beach visitors and vacationers here. It's a long-term investment and an opportunity to make the city more attractive to its many residents again. Together, we'll make a few changes to transform this bleak place into a beach paradise with recreational offers and vacation facilities. This beach used to be noted in every tourist guide for this country and has always been a popular meeting place for a stroll along the water. Now the glamour of the old days has faded and, sadly, it barely looks the same. Everywhere there are sandy paths, dirt, and decay. I'm happy that your company is accepting the job to bring this place back to life.

This guide refers to the steps and rewards with the highest job scope. Adjusting the job scope to medium or low will result in fewer steps and reduced rewards.

Sandy Ambience
Sandy Ambience

Required Vehicles

  • Dump truck (any)
  • Bulldozer
  • Flatbed crane or Tractor + Cargo Trailer
  • Soil compactor
  • Concrete mixer
  • Stationary or mobile crane
  • Tractor + Multitrailer

Recommended Vehicles

  • Tractor with crane + Multitrailer

Boardwalk[edit]

Briefing
  • Speak with the tourism officer
Land Development (103,200)
  • Flatten area
Construction Preparation (264,500)
  • Deliver Construction Materials
    • Required materials: Bulk Material Transport Sack (x2), Rebar Mesh (x2), Pallet of Paving Stones (x2), Pallet of Concrete Bags
  • Deliver and Spread Gravel
  • Compact gravel
Concrete Construction (116,000)
  • Unpack construction materials
  • Pour fountain
  • Pour concrete
Bulk Material Delivery (229,700)
  • Deliver and unload sand
  • Deliver and unload sand
  • Deliver and unload soil
  • Deliver and unload soil
Concrete Construction (105,800)
  • Deliver construction materials
    • Required materials: Rebar Mesh, Pallet of Concrete Bags, Pallet of Wood (x2), Wood Beams, Pallet of Oriented Strand Boards
  • Unpack construction materials
  • Pour concrete
Light Structure (26,000)
  • Unpack construction materials
  • Place pillars
  • Place roof truss
  • Place roof truss
Crane Work (57,500)
  • Place concrete components
  • Place concrete components
  • Place concrete components
Transport (5000)
  • Deliver special components
    • The cargo containers are at the steel trade.
    • No purchase necessary.
    • Large multitrailer recommended.
    • Cannot be double-stacked.
Debriefing
  • Speak with the tourism officer

With this new look, the beach promenade is ready to be featured in any tourist brochure again. I hope that soon it will return to being the popular strolling area for tourists and residents that it used to be. I'll hire a photographer immediately, since we now have to focus on promoting this city. Many thanks to you and your team. You really did a great job here.